Chorley United Reformed Church, Chorley

The Church wanted to enhance services by installing a projector to the front of the church. A range of options had been discussed but the Ampec solution was to install two Hitachi Ultra Short throw projectors on to the side walls at the front of the church. And for the members of the choir in the choir stalls we fitted a 60” Plasma TV monitor at the rear of the church. All connectivity was achieved using CAT5e cable for VGA Composite video and HDMI.

Two Hitachi Ultra Short throw projectors at the front of the church. The stunning images are projected directly on to a pastel pink wall. Aestetically wired from the rear of the projector…we dont like to see wires!!

Two Hitachi Ultra Short throw projectors at the front of the church. The stunning images are projected directly on to a pastel pink wall. Aestetically wired from the rear of the projector…we dont like to see wires!!

To improve the sound system we supplied a JTS UHF Dual diversity system with six head microphones. These have been very successful particularly when the young children participate in the service.